Gilbert approves short-term rental licensing program with $100 fees, 7-0 vote
GILBERT, ARIZONA — August 16, 2023

Gilbert approves short-term rental licensing program with $100 fees, 7-0 vote

Gilbert Town Council meeting featuring contentious public comments on alleged permit violations and code enforcement failures at 2711 East Melrose with litigation risk, approval of short-term rental licensing program, and launch of comprehensive performance management dashboard system.


Gilbert Council Approves Short-Term Rental Licensing While Melrose Street Development Threatens Litigation

On August 16, 2023, the Gilbert Town Council voted 7-0 to approve a short-term rental (STR) licensing program and received a substantive presentation on a multi-year performance management dashboard initiative. The meeting was dominated, however, by eight residents testifying about alleged code violations, wrongful permit approval, and infrastructure failures at 2711 East Melrose—a development that neighbors say has flooded their properties for 18 months and exposed the town to litigation risk through staff's apparent attempt to secretly transfer a public water easement without council authorization.

Key Speeches

"The town initially rejected the application for a permit for the new multi-level structure multiple times while noting that each time guest quarters shall be single floor per Land Development code but then without any explanation the town changed its position and approved the permit." — Amy Langdon, neighbor and resident

"You as council members and as the mayor have become distracted doing other things or you are simply unaware of what has continued to happen and you have lost sight of the promises that you have made." — Ernest Langdon, neighbor and resident

"When Town discovered that the building was being built over the public water easement rather than require the building to be removed off the easement Town staff apparently tried to secretly give away a portion of the town's easement." — Chris Walker, litigation attorney and resident

"My property has been flooding for about a year and a half anytime it rains any amount of rain... a grading and drainage plan has been submitted and my property continues to flood it has not been implemented not a shovel full of dirt has been moved." — Nate Lesuer, adjacent property owner

Timeline

Public comment: Eight residents testified during the Communications from Citizens portion. The first four speakers focused on the 2711 East Melrose controversy; Monte Lyons raised a traffic safety concern at Pecos Road (one-way turn without signage causing drivers to enter oncoming traffic); and Allison Dambrosio testified on rare disease advocacy (Esplania awareness for her late son Travis).

2711 East Melrose development history (as testified):

Consent calendar vote: Item 32 (Public Works Advisory Board appointments) passed 7-0.

Public hearing items 27-29: Passed 7-0 without presentation or public comment.

Item 30 (Short-Term Rental Licensing Fee): Finance staff presented; council discussion followed; passed 7-0.

Item 31a (Bureau of Reclamation Proposal Authority): Passed 7-0 with brief discussion.

Performance Management Dashboard presentation: Nikki McCarty (Chief Performance Officer), Chief Michael Silverberg (Gilbert Police Department), and Jessica Marlow (Public Works Director) presented overview, pilot results, and live dashboard previews. No vote required; presentation and discussion only.

Opposition

Number of speakers: Five speakers directly opposed or raised concerns about the 2711 East Melrose development.

Main concerns:

  1. Permit approval reversal without explanation: Town staff rejected the permit multiple times, citing code violations, then approved it without any stated reason or council discussion.
  2. Unauthorized structure over public easement: The building was constructed over the town's public water easement; town staff allegedly attempted to transfer the easement without a council vote, which neighbors claim violates Arizona State law requiring council approval and compensation.
  3. Inadequate drainage and water trespass: The project lacked a drainage and grading retention plan at permit issuance; the inadequate approved plan causes stormwater to divert to neighboring properties, causing flooding for 18 months.
  4. Drainage plan does not meet code: The approved plan falls 800 cubic feet short of retention requirements and does not address the original dwelling's front half; it also requires a retaining wall to be built within the town's public water easement, which neighbors claim is prohibited.
  5. Stop work order lifted prematurely: Order was lifted without first ensuring the drainage plan was implemented or functional, contrary to code-compliance logic.
  6. Staff circumventing council oversight: Residents alleged that town staff and the town attorney knowingly violated the town's own rules and regulations to accommodate the project, bypassing council authority.
  7. Ongoing construction despite violations: Work has continued despite alleged violations and notices of claim filed by neighbors.

Most compelling arguments:

Organized groups: None identified; residents acted as individuals and neighbors.

Support

No speakers testified in support of the 2711 East Melrose project. One commenter online supported the short-term rental licensing program (noted by staff).

Project Details

2711 East Melrose Development (Disputed)


Short-Term Rental Licensing Program


Performance Management Dashboard Program

Vote Breakdown

Consent Calendar (Items 1-26, 32) – 7-0 Approved

Public Hearing Items 27-29 – 7-0 Approved

Item 30 (Short-Term Rental Licensing Fee) – 7-0 Approved

Item 31a (Bureau of Reclamation Proposal Authority) – 7-0 Approved

Note: Individual council member votes not stated in transcript; all motions passed unanimously.

Outcome & Next Steps

Short-Term Rental Licensing Program: The $100 initial and $100 annual renewal fee was approved and will take effect September 15, 2023. The Finance team confirmed that Govara West will host the online portal, the town will maintain a 24/7 complaint hotline with the number distributed to neighbors, and the portal will also be posted on gilbertaz.gov. Chuck Bongiovanni requested coordination with Economic Development to provide renters with information about Gilbert resources (HOA guidelines, town rules, attractions). Staff confirmed this work is already underway. Council Member Buckley raised a scenario in which a neighboring resident cannot reach a new short-term rental owner after the property changes hands; staff confirmed Govara West re-scans every 3-5 days and the Assessor's database updates within a couple of business days. License suspension for persistent violations is possible for up to 12 months.

2711 East Melrose Development: No action was taken during the meeting. Residents requested that the item be brought before council at a future agenda meeting. The council did not respond with a specific commitment, though several council members indicated (according to resident testimony) that they had previously promised action. Two neighbors have filed notices of claim, which are prerequisites to suing the municipality. The matter remains unresolved, with construction ongoing and litigation threatened.

Performance Management Dashboard Program: No vote required. The presentation was informational and exploratory. Dashboards are scheduled to go live publicly in September 2023. Police and Public Works will launch first; Courts, Development Services, and Economic Development will follow in September 2023. Organization-wide rollout is targeted within 18 months. The council expressed enthusiasm; Mayor Peterson and Scott Anderson and Chuck Bongiovanni each praised the initiative's alignment with the "City of the Future" strategic plan and its potential to drive transparency and operational efficiency. Scott Anderson noted that the dashboards tie each metric directly to a specific "City of the Future" indicator, enabling data-driven action to prevent the pitfalls other municipalities have experienced.

Colorado River Shortage: Town Manager Patrick Ellis announced that the Bureau of Reclamation declared a Tier One shortage for 2024, a temporary improvement due to above-average snowpack this past winter. However, the system remains on a negative trajectory. Gilbert is activating Stage One of its local drought plan. Residents can access more information at gilbertaz.gov/watershortage.

September 5 Meeting Canceled: Mayor Peterson announced that the September 5, 2023 council meeting has been canceled. The next meeting will be held on Tuesday, September 19, 2023.

Controversies & Context

2711 East Melrose—Institutional Failure and Litigation Risk

The Melrose Street development represents a rare and troubling disconnect between town staff actions and council oversight. Residents' accounts suggest the following sequence:

  1. Initial rejection and approval reversal: Town staff rejected the permit application multiple times, explicitly citing Land Development Code provisions requiring guest quarters to be single-floor. Then, without explanation or council discussion, staff reversed course and approved the permit.

  2. Public easement transfer without council vote: When town staff discovered the structure was being constructed over the town's public water easement, residents allege that staff attempted to transfer (or "give away") the easement rather than require the structure's removal. According to Amy Langdon, "Arizona law requires the Town Council that it must approve and vote on matters such as giving away the town's public easement." The residents could find no record of such a council vote. Chris Walker, a litigation attorney, stated that based on his 20 years of experience representing public entities, such a transfer would require council approval—a step he could not document in public records.

  3. Inadequate drainage causing water trespass: The project lacked a drainage and grading retention plan when the permit was issued—a requirement specifically designed to help staff "understand the size and scope of the project." After the stop work order was issued due to this omission, a drainage plan was eventually approved. However, neighbors' independent review found it falls 800 cubic feet short of retention requirements and does not account for the original dwelling. The plan also requires a retaining wall to be built within the town's public water easement, which residents claim is impermissible.

  4. Stop work order lifted prematurely: The order was lifted without ensuring the drainage plan was implemented first. Nate Lesuer testified that while the plan was approved months ago, "not a shovel full of dirt has been moved" to implement it, and his property continues to flood.

  5. Council promises unfulfilled: In January 2023, several council members visited the property and told residents the project was inappropriate and that the council would act. One council member put this in writing. Eight months later, residents returned to find no meaningful enforcement. Ernest Langdon accused the council of becoming "distracted" or "unaware" and of breaking written promises.

  6. Litigation prerequisites filed: Two neighbors have filed notices of claim, which under Arizona law are necessary precursors to filing suit for damages against the municipality. Chris Walker framed the evening's testimony as "one last sincere effort to attempt to avoid litigation with the town."

Ethics Concerns—Yung Koprowski Y2K Engineering Firm

Public commenter Terry Natty questioned the ethics of Yung Koprowski Y2K Engineering firm being contracted for town work. Yung Koprowski responded via email (read aloud by Natty) that she "adheres to ethical standards and legal obligations" and that her role as council member prohibits her or her spouse from being contracted with the town. However, Natty contended that the response does not adequately address his concerns, citing limited alternatives and proprietary work restrictions. This concern was raised but not addressed substantively during the meeting; it remains on the council's agenda for consideration.

Colorado River Shortage—Tier One for 2024

The Bureau of Reclamation's announcement of a Tier One shortage for 2024 underscores Gilbert's long-term water security challenge. While above-average winter snowpack provided temporary relief, the system is described as remaining "on a negative trajectory." Gilbert's activation of Stage One of its local drought plan signals preparation for potentially more severe shortages ahead, particularly as the Colorado River Compact allocation system continues to adjust to decades of overallocation and climate change impacts.

Duration

Other Notable Items

Public Works Advisory Board Appointments: Yung Koprowski moved approval of nine new members to the Public Works Advisory Board: Greg Frolick, Eric Mileski, Jason Robinson, and Jason Gilmore (two-year terms beginning August 15, 2025); Faria Sheriff, Matt Carpenter, Sam Elliott, David Barazodo, and Karen Goldwasser (three-year terms beginning August 14, 2026). Approved 7-0.

Traffic Safety Concern at Pecos Road: Monte Lyons testified about a dangerous one-way turn at a shopping center on Pecos Road between Val Vista and Rome, where drivers daily drive into oncoming traffic to avoid using three other safer exits. He reported contacting police and being dismissed. The council did not directly address the issue during the meeting, though it was noted for staff follow-up.

Back-to-School Shopping Event: Mayor Peterson highlighted the annual Fire Department back-to-school shopping event held at Kohl's (Val Vista and Williams Field), which provided 150 gift cards to families. He thanked the American Legion Post 39 Auxiliary and commended the fire department for volunteering their time on a Saturday morning.

Condolence: Mayor Peterson announced the death of Emelina Peterson Turley, sister of State Senator Warren Peterson and former council member and vice mayor Victor Peterson, who passed away after a three-and-a-half-year battle with cancer at age 51.

Teacher Supply Drive: The town is running a teacher supply drive September 1-21, with an Amazon wish list available via QR code for donations of classroom supplies to Higley and Gilbert school districts.

New National American Miss Arizona: Mayor Peterson recognized Sophia Levels, a Gilbert resident, as the newly crowned National American Miss Arizona.